Spies-5/19/03-----_/_/20__
5/19--verizon in lake geneva-rich, I drove bothways total 220 miles,4 hrs.
5/20--""""""""""""""""""""- rich
5/21--"""""alone
5/22--nazahaf heights-rich stained int.plastic doors,terry sprayed 2 cabin ext.cedar,I primed rails roller and brush,top coated door trim anb part of jambs,rails posts door trim, jambs
5/23--"""""""""""""""-rich
5/27-- nazahaf heigths-terry sprayed primed 1 last rails then sprayed out 4 rails,and posts,I striped 1 door,prime 6 doors,taped and preped jambs,painted 6 jamb stripes
5/28-- """"""""""""""-terryand i touched up and cleaned over spray off,touched up walls puttied,I toped coated 6 doors cleaned off others stains,off hardware
5/29-- marshow clinic- scraped and sanded stairway spindells,hand rails,botom part of metel steps. taped hand rails on walls in stairway for other guy to spray out,painted small ceilings in lobby,and int.window letells,block filled ulity rm. that was only part complete i finished it
5/30--marshow clinic,stained chair rail,put rubber plugs back in door frames,top coated ulity room.
6/2--hospice alone,primed trelles
6/3--started at hospice,but rained drove back to shop to go to Alterra, painted 2 bathroms that had to be cut in around paper border,then at 10:45 drove back out to hospice,top coated middle part of wood rafters till 3;30
6/4--started at 6:45am till 11:00 at hospise top coating trelles,completed. moved on to Alterra,painted 2 bath rms.including clean off old paint splatted on door trim
6/5--Alterra,painted 3 bath rms.cut in border around ceiling and walls,completed 1st wing,moved to other side,prep.bath walls and ceilings for painting the next day task.
6/7--Alterra,painted 4,and half (the double size 1 on the wing side we started from) a bath rms.
6/9--Alterra,took hand rails off in wing first started in,top coated ceilings and walls in that same wing,also the middle hallway,started in the rooms on the other side wing,got the ceiling,and 1/4 walls down,cleaned off more excessing paint on door trim,from last paint job.
6/10--Alterra,finished rm.#1 on nw side of wing.top coated rm.#3complete.finished double size bath on other first start wing.top coated ceiling,and 1/4 down on walls in rm.#5,plus the closet.
6/11--Alterra,finished rm#5,great rm top coated,helped top coat sitting rms.in middleplates back on.
6/12--- Alterra,bath rms,sleeping rms. top coated,primed 3 bath rm walls after knock down,only parts of walls and ceilings need priming.
6/friday the 13th--- Alterra,top coated front entryway so they could base on,then finished top coating 4 bath rms,2 i did not have to cut in since border was down,2 I had to cut in around border,put hand rails back up on first wing and middle hallway.
6/14--sheboygan factory,sprayed out ceiling dry fall,Sat.over time 10 hrs. crew of 5.
6/15--Sheboygan factory,job#172,sprayed out ceilings,and tracks,cleaned dry fall. worked 9 hrs.overtime.
6/16--Alterra,top coated dinning rm.top coated kitchen,helped put hand rails back up on last side of wing.primed bangs on metal beads at edges.
6/17--Alterra,top coated mech.rms.top coat bead edges,touched up,finished pouch list. 7hrs.
6/18--Howard grove sewage plant,chased yellow hollidays,chased green holliadays,chased buff holidays 7.05 hrs
6/19--Howard Grove sewage plant,top coated running cap trim on top of roofs.cleaned rails off,no luck in cuttih threw tho on all.touched up green bleeds.8 hrs
6/23--Walker house,roll out ceilings and walls.2 bed rms,1 kitchen,1 bath,1 hallway.2 coats on kitchen ceiling,and bath.2 coats on bath walls,and 1 bedrm.both were green.
6/24--zigler building,sprayed 2 coats on lower block in front of building.
6/25--zigler building,sprayed front posts bottom blocks,2 sides of building.5 1/2 hrs.worked.
6/26--pentair help put up plastic,tape off and spray sm. area of green line on back wall.
6/27-- tyson school,prime out dark green wall,top coat block walls in metals shop.
6/28--Pentair,over time,spray ceilings,2nd shift
6/29--Pentair,overtime,clean up,4 1/4 hrs. 2nd shift.
6/30--Aldrich chemicals,mask off job area,prep.
7/1--Aldrich chemicals,finish masking,dropping plastic,rolled some areas with hotdog roller behind pipes. helped with floor work for 3 hrs of the working day.
7/2--Aldrich chemicals, finished spraying top coating job,pulled plastic,cleaned pump,cleaned floor of sm.amount of over spray,and some spill,cut in,remove plastic from work area to dumpster,all to wet for complete removel,Rich helped with plastic removel for 45 min.
7/3--Aldrich chemicals,pull of foil,tape, touch up,helped on floor with jason